Welding Inspector, NWI
Описание
E D U C A T I O N
M A S T E R O F S C I E N C E :
M E C H A N I C A L E N G I N E E R I N G /
M A J O R I N C H E M I C A L
P R O D U C T I O N E Q U I P M E N T
Moscow Engineering and Physical Institute
1980 – 1986
S K I L L S
➢ P R O F E S S I O N A L
CSWIP 3.1 Welding Inspection
Good knowledge ISO 9001, ASME ,
AWS, API, ASTM codes
Quality Control and Assurance
Welding Procedure Qualification
Qualification testing
Deft in handling QC inspections:
VT inspection
Painting & Insulation inspection
Piping, Welding and Non Destructive
Testing
Calibration
Documentation
Talented and precision -focused QA/ QC WELDING PIPING SUPERVISOR with
more than 12 years’ experience in welding, installation of process piping, and
erection of on -site construction units and structures and setting of production
facilities, inspection, and supervision. Excel at improving productivity and
maintaining exceptional safety s tandards. Success conducting thorough
inspections and ensuring adherence to superior quality controls. Outstanding
design, blueprint reading, and mathematical abilities. Continually follow advances
in welding industry to maximize efficiency.
Q A / Q C S U P E R V I S O R
Linde Engineering GmbH | Oct 2018 – 2020
Project: Amur Gas Processing Plant. Objects: NGL/NRU Cold Box Package,
Demethanizer, Helium Recovery Cold Box Package, NRU Columns, pipe racks.
o Reviewed, approved and ensured implementation of the Contractors
Inspection and Test Plan, method statement for fabrication, and welding
quality procedures, WPSs, participated in the development of Project quality -
related procedures and WPS.
o Supervi sed over Contractor’s activity in project execution in compliance with
HSE standards and expected quality, schedule, and costs. Monitoring and
inspecting all work performed by welders and/or welding operators.
o Verified the application of NDT methods for inspection activities, X -ray films
reviewed.
o Supervised under Site Manager command over EPC Contractor and
Subcontractor during prefabrication, installation and erection, testing of
process piping.
o Identified all possible risks, opportunities o r threats that might positively or
negatively impacted quality or project targets. Provided assistance in the
development and implementation of action plans for unexpected
circumstances to the extent necessary to maintain the required work rate.
o Worked wit h field design and fabrication teams to verify and approve all
Contractor’s work results.
o Issued various reports such as Inspection, Non -conformity Reports,
weekly/monthly reports on operation performance to control Key Performance
Indicators (KPI) and cri tical data analysis.
o Provided assistance in review and timely authorization of technical deviation
requests.
o Played an active role in the development of the Safety, Hazard ID’s and IIF
culture on the project, making safety a natural part of all work perfor med.
Key Contributions:
• Developed a specialized tracking method to monitor and improve the
Contractor's welding department accuracy and productivity.
• Identified and corrected a quality issue with a major welding project,
preventing potentially thousands of dollars in future repair and damage
costs.
+7 99 9 631 4796
alexander.shchukin 1@gmail .com
79 NOVOK UZNECHNAYA STREET,
KRASNODAR , 350000, RUSSIA
https://www.linkedin.com/in/alexan
der -shchukin -96513485/
A L E X A N D E R
S H C H U K I N
Q A / Q C W E L D I N G S U P E R V I S O R C S W I P 3 . 1
C O N T A C T
P R O F E S S I O N A L P R O F I L E
W O R K E X P E R I E N C E
S E N I O R E X P E D I T I N G A N D Q U A L I T Y I N S P E C T O R
AO Casale Project v g. Tolyatti | Feb 2020 – Until now
Project: Togliatti TOAZ
o Coordinate the achievement of the plant completion performed by
subcontractors as defined in the project plans and schedules
o Responsible for static equipment refurbishment and expediting .
Key Contributions:
• Expedit ed the release of static equipment to the site by 50% .
A C H I E V E M E N T
Q U A L I T Y I M P R O V E M E N T
Improved the quality of stainless steel welding on the project by 20% due to additional training and tool and Tool box meetings for welders and
foremen. 201 9 - Linde Engineering GmbH
T U R N A R O U N D T I M E S
R E D U C T I O N Reduced turnaround
times on Tengiz Project by 15% due to
workplace management
201 7 - Tengiz Project
W E L D I N G P I P I N G S U P E R V I S O R
ERSAI CASPIAN CONTRACTOR | Oct 2 017 – Oct 201 8
Project: Tengiz Future Growth Project -Wellhead Pressure Management Project.
o Supervised and coordinated efforts of welding gangs engaged in welding of
process piping and steel structures .
o Coordinated welding activities for SMAW, GTAW, FCAW processes.
o Collaborated with engineers and Superintendent regarding Steel Structure s
and process piping design. Detected any design errors, and where possible
rectified the same.
o Provided s upervision and reporting within the discipline framework.
o Detected any design errors, and where possible rectified the same.
o Provided daily activity report on HSE, progress, material status, quality issues
and resources afforded to the work.
Key Contributions:
• Reduced turnaround times and saved $2,000/month through steadfast
development of standardized procedures.
• The maximum weekly repair rate for each welder has been reduced to
1% due to continuous welding quality control.
HVAC
Q C W E L D I N G S U P E R V I S O R
O.M.A. OFFICINA METALMECCANICA ANGELUCCI S.P.A. | Dec 2016 – Oct 2017
Project: Turk Stream Offshore Pipeline Project WP5.1. Landfall Facility
Construction.
o Ensured that the quality plan is implemented and the activities meet
contractual requirements, applicable codes, specifications, and standards.
o Reviewed of Isometric Drawings & ensured Approved WPS, as well as
Qualified welders, were available.
o Ensured that approved WPS were followed.
o Co -ordination with Clients and NDT Subcontractors.
o Safe and efficient supervision over all aspects of on -site fabrication
activities.
o Interpreted/Reviewed NDT reports and maintain all related files and records.
Key Contributions:
• With my participation, the reject rate of welded join ts decreased by 20%.
• High focus on ensuring that all aspects of the construction work were
performed safely as a consequence lower accident rate.
S K I L L S
➢ T E C H N I C A L
S K I L L S
Excellent communication and
interpersonal skills
Goal Oriented and Results Driven Team
Leader
High attention to detail
Ability to work under pressure
Work under minimal supervision
Conflict resolution
Self -motivation
Outlook
Microsoft Word
Adobe Illustrator
PowerPoint
Microsoft Excel
W O R K E X P E R I E N C E C O N T I N U E D
L E A D Q A / Q C E N G I N E E R . HE A D O F T E C H N I C A L S U P E R V I S I O N G R O U P
TEKHNOEKSPERTSERVIS LLC | Feb 2013 – Nov 20 16
Project: Filanovskiy gas -and -oil field facilities construction Project. The Caspian
Sea, offshore and onshore sections. Pyakyahinka gas -and -oil field facilities
construction. “LUKOIL” LLC Client representative.
o Ensured all installation and offshore pipeline laying works manufactured in
strict accordance with the requirements of DNV -OS -F101 -2000.
o Reviewed ITP/WPS/WPQR/WPQ, witnessed and certified Welding
Procedures and Welder Qualification Tests, witnessed labora tory Mechanical
tests for Welding Procedure Qualification.
o Reviewed RT films and other NDT reports, monitored welder rejection rate,
reviewed PWHT reports and charts, etc.
o Witnessed/conducted Hydro/Pneumatic test, Welder Qualification Test in
plate and p ipes in accordance with the Welding Procedure Specification
(WPS) / ASME IX and monitored their continuity records.
Key Contributions:
• Proactively assisted team members, interacting positively to ensure
timely, quality completion of critical projects within the deadline.
• During the review and approval of the Contractor’s ITP, and various
procedures, I issued a methodological opinion on the procedures for
installation, production, and welding quality, WPS, which significantly
impro ved the quality of construction.
S E R T I F I C A T I O N
C S W I P 3 . 1 W E L D I N G
I N S P E C T O R
Certificate
No: 0000736599
201 9 - Istanbul
V I S U A L A N D D I M E N S I O N A L
I N S P E C T I O N ( I I L E V E L )
U T , R T , M T
2019 - Russia
I N T E R E S TS
Photography
Painting
Travelling
Football
Cycling
LANGUAGE SKILLS
English Fluent
Russian Native Speaker
Q A / Q C E N G I N E E R
INTERTEK. MOODY INTERNATIONAL | Ma y 201 1 – Feb 2013
"Achimgaz", "TNK -BP -Uvat", "Bashneft - pole",Trebs and Titov oil field Projects.
o Participated in the incoming inspection of processing equipment, pipes,
fittings, flanges, mechanical equipment, all base, and consumable materials.
Control of correct stora ge of welding materials.
o Plant piping & welding fabrication inspection experience for Carbon, LTCS,
Low alloy & stainless steel pipes, including punch listing, review of Test Pack,
reinstatement, etc.
o HVAC Inspections. Painting & Insulation inspection s as per contract
specification & applicable codes.
o Compilations of weekly/monthly reports, attending project meetings, monitor
non -conformities, and site discrepancy issues and advising corrective
actions, etc.
o Work ed with field design and fabrication teams to verify and approve all
Contractor’s work results. Enforcement of compliance with specifications,
standards and schedules.
Key Contri butions:
• Played a leadership role in the development of the safety culture on the
projects, making safety a natural part of all work performed.
W E L D I N G S U P E R V I S O R
OJSC"MEZHREGIONTRUBOPROVODSTROY" (MRTS), “SGK -
TRUBOPROVODSTROY” LLC | Aug 20 08 – May 2011
o Oversaw and coordinated efforts of teams of welders engaged in welding of
main oil & gas pipelines, installation of process piping and erection of on -site
construction and steel structures.
o Participated in interpret blueprints to effectively instruct welders in advanced
fabrication techniques.
o Performed welding of critical and high -value components.
o Inspected all fabricated materials after assembly for adherence to project
specifications an d quality standards.
o Contributed to staff management to include hiring, shift scheduling, training,
and team building.
Key Contributions:
• Boosted productivity and reduced downtime by continually researching
and implementing the latest tools, equipme nt, and techniques. •
• Substantially improved existing procedures and enhanced the Q C
process while establishing open lines of communication with
management.
W O R K E X P E R I E N C E C O N T I N U E D
M E C H A N I C A L H V A C E N G I N E E R I N P O W E R B U I L D I N G . C & I
E N G I N E E R
Federal State Unitary Enterprise (FSUE) “Production Association (PA) “Mayak” |
Jun 198 5 – Aug 2008
o Organized and conducted Overhaul and maintenance of HVAC, heat network
pipelines, steam pipelines, heating systems, water supply, drainage,
sewerage, ventilation as well a s technological and repair shop equipment.
o Supervised the quality of assembly and welding works, issued a work permit
for a hazardous work environment.
o Scheduled preventive maintenance energy systems and workshop equipment,
the control over its implementa tion. Prepared annual orders for spare parts,
components, and materials in accordance with the preventive maintenance
schedule.
o Calculated an amount of necessary maintenance personnel.
o Organized repair of nuclear reactor group flowmeters, pressure measurement
instruments, control instruments, and devices.
Key Contributions:
• Reduced turnaround times and saved 20,000rubles/month through
streamlining of working procedures.
30 сентября, 2016
Владимир
Город
Кстово
Возраст
64 года (28 марта 1960)
25 августа, 2017
Алла
Город
Кстово
Возраст
30 лет (20 февраля 1994)
12 июля, 2016
Татьяна
Город
Кстово
Возраст
49 лет (20 февраля 1975)